References Germany

The list below shows a few of the approximately 2.000 works who are carried out by us annually.

Date City Description Used material
2009 till 2010 Ahaus Increase warehouse 1.900 m horizontal dewatering, 11 pumps 
2009 Vorhop Pipeline  3.000 m vertical dewatering, horizontal dewatering, 20 pumps 
2009 Bocholt Industrial Park Mussum  12 deepwells till a depth of 12 meters.
2008 Lünen Sewerage activities  600 m vertical dewatering with Elektronic pumps
2008 Etzel Pipeline

1.300 m horizontal dewatering, de-ironing systems

Project

2007 till 2009 Garzweiler, Tagebau Dewatering activities  15.000 m horizontal & vertical dewatering 
2007 till 2008 Hamm Increase permises Claas 2.500 m horizontal dewatering 
Sep 2005 till Okt 2006 Bad Soden Salmunster Dewatering several deepwells 23 deepwells equipped with submersible pumps and vacuum piston pumps
Sep 2005 till Mar 2006 Neuwied am Rhein Pumping installation 650 m pipeline DN 480 HDPE, pumps (diesel - 150 l/sec) for polluted water
Sep 2005 till Dec 2005 Wülfrath Pumping activities 2 pumps with a capacity of 200 l/sec for heavily polluted water and 250 m pipeline DN 400 HDPE
Sep 2005 till Dec 2005 Wuppertal Pumping activities of contaminated groundwater
2 pollution pumps (diesel) with all the necessary pipes
Sep 2005 till Nov 2005 Werne Pumps of 277 l/sec Pumps of 2 x 150 m, pipes DN 300
Sep 2005 till Nov 2005 Wilhelmshaven Sewer system Deepdrainagedrain up till 6,50 metreas depth and deepwells
Aug 2005 till Okt 2005 Eltville am Rhein Pumps of 150 l/sec Diesel pollution pumps with 1.200 m pipes (steel DN 300)
Jan 2002 till Apr 2005 München 2,5 km long construction pit in the centre of München 180 deepwells till a depth of 50 metres, 35 deepwells till a depth of 15 metres, 6 pumping installations with a capacity of 4.800 up to 24.000 m³/d, many conduit-pipes, filters, alarms by telephone, measure equipment
Aug 2004 till Nov 2004 Eschwege Sewer system We needed a pump with a capacity of 10.400 m³/d. The length was 130 m with a dubble pipe 600 DN of steel
Jan 2004 till Aug 2004 Berlin Marzahn Pumping activities of 60.500 m³/d and 43.200 m3/d Pump container 65.600 m³/d, 100kVa aggregate and 180 m DN600 steel pipeline
Okt 2003 till Mar 2004 Bracht Pumping installation of 21.600 m³/d Two pumps of a capacity of 8.700 m³/d each. Pumps over a lenght of 2.800 m incl. pipeline bridges, alarms and measure equipment
Jul 2003 till Sep 2003 Rostock, Patriotischer Weg Pumping activities of 55.000 m³/d over a distance of 110 metres. Pump container with a capacity of 65.500 m³/d, 2x110 m steel conduit pipes DN 350
Apr 2003 till Jul 2003 Remscheid Pumping 64.800 m³/d through a wildlife area where there was no possibitity to use machines Pump container, 800 m conduit pipes with the building of a a bridge of 5 m height and 12 m length. Inclusive an emergency power unit and a tank of 5.000 litres.
Aug 2002 till May 2003 Mannheimer, Versicherungen Drainage for a parking place of 12 m depth 14 deepwells, 15 m submersible pumps with a capacity of 1.720 m3/d, pumping installation of 12.100 m³/d, 3 km conduit pipes DN 300
Jan 2002 till Feb 2003 Berlin, An der Freiheit Pumping activities of 48.000 m³/d dirty and clean water over a distance of 230 metres. Pumpcontainer with a capacity of 55.600 m³/d with an alarm by telephone