| 2009 till 2010 |
Ahaus |
Increase warehouse |
1.900 m horizontal dewatering, 11 pumps |
| 2009 |
Vorhop |
Pipeline |
3.000 m vertical dewatering, horizontal dewatering, 20 pumps |
| 2009 |
Bocholt |
Industrial Park Mussum |
12 deepwells till a depth of 12 meters. |
| 2008 |
Lünen |
Sewerage activities |
600 m vertical dewatering with Elektronic pumps |
| 2008 |
Etzel |
Pipeline |
1.300 m horizontal dewatering, de-ironing systems
Project
|
| 2007 till 2009 |
Garzweiler, Tagebau |
Dewatering activities |
15.000 m horizontal & vertical dewatering |
| 2007 till 2008 |
Hamm |
Increase permises Claas |
2.500 m horizontal dewatering |
| Sep 2005 till Okt 2006 |
Bad Soden Salmunster |
Dewatering several deepwells |
23 deepwells equipped with submersible pumps and vacuum piston pumps |
| Sep 2005 till Mar 2006 |
Neuwied am Rhein |
Pumping installation |
650 m pipeline DN 480 HDPE, pumps (diesel - 150 l/sec) for polluted water |
| Sep 2005 till Dec 2005 |
Wülfrath |
Pumping activities |
2 pumps with a capacity of 200 l/sec for heavily polluted water and 250 m pipeline DN 400 HDPE |
| Sep 2005 till Dec 2005 |
Wuppertal |
Pumping activities of contaminated groundwater
|
2 pollution pumps (diesel) with all the necessary pipes |
| Sep 2005 till Nov 2005 |
Werne |
Pumps of 277 l/sec |
Pumps of 2 x 150 m, pipes DN 300 |
| Sep 2005 till Nov 2005 |
Wilhelmshaven |
Sewer system |
Deepdrainagedrain up till 6,50 metreas depth and deepwells |
| Aug 2005 till Okt 2005 |
Eltville am Rhein |
Pumps of 150 l/sec |
Diesel pollution pumps with 1.200 m pipes (steel DN 300) |
| Jan 2002 till Apr 2005 |
München |
2,5 km long construction pit in the centre of München |
180 deepwells till a depth of 50 metres, 35 deepwells till a depth of 15 metres, 6 pumping installations with a capacity of 4.800 up to 24.000 m³/d, many conduit-pipes, filters, alarms by telephone, measure equipment |
| Aug 2004 till Nov 2004 |
Eschwege |
Sewer system |
We needed a pump with a capacity of 10.400 m³/d. The length was 130 m with a dubble pipe 600 DN of steel |
| Jan 2004 till Aug 2004 |
Berlin Marzahn |
Pumping activities of 60.500 m³/d and 43.200 m3/d |
Pump container 65.600 m³/d, 100kVa aggregate and 180 m DN600 steel pipeline |
| Okt 2003 till Mar 2004 |
Bracht |
Pumping installation of 21.600 m³/d |
Two pumps of a capacity of 8.700 m³/d each. Pumps over a lenght of 2.800 m incl. pipeline bridges, alarms and measure equipment |
| Jul 2003 till Sep 2003 |
Rostock, Patriotischer Weg |
Pumping activities of 55.000 m³/d over a distance of 110 metres. |
Pump container with a capacity of 65.500 m³/d, 2x110 m steel conduit pipes DN 350 |
| Apr 2003 till Jul 2003 |
Remscheid |
Pumping 64.800 m³/d through a wildlife area where there was no possibitity to use machines |
Pump container, 800 m conduit pipes with the building of a a bridge of 5 m height and 12 m length. Inclusive an emergency power unit and a tank of 5.000 litres. |
| Aug 2002 till May 2003 |
Mannheimer, Versicherungen |
Drainage for a parking place of 12 m depth |
14 deepwells, 15 m submersible pumps with a capacity of 1.720 m3/d, pumping installation of 12.100 m³/d, 3 km conduit pipes DN 300 |
| Jan 2002 till Feb 2003 |
Berlin, An der Freiheit |
Pumping activities of 48.000 m³/d dirty and clean water over a distance of 230 metres. |
Pumpcontainer with a capacity of 55.600 m³/d with an alarm by telephone |